School report · Lexington Public School, Waterloo

355 students.113 permanent places.

Lexington Public School has more than three times as many students as it has permanent places, the highest rate in the Waterloo Region District School Board. The board approved a 13-classroom addition in 2010. It was never funded. Here are the numbers, the history and the sources.

More than triple its permanent capacityHighest rate in the board

The numbers

More than triple its permanent capacity.

Capacity here means permanent space. The official count, called on-the-ground capacity, “does not include portables or portapaks.”[2] Enrolment is the Ministry of Education’s October 31 headcount.

355

Students, 2024-25

Ministry of Education headcount, rounded to the nearest five.[1]

113

Permanent places

From the board’s 2020-2030 accommodation plan. No newer figure has been published.[2]

314%

Of permanent capacity

355 ÷ 113. The next-highest school in the board is at 150%.

#8

In Ontario, 2020-21

Of 4,790 schools, in the latest province-wide data. A calculated rank, not a Ministry list.[3]

Each square is one student.

  • 113 students the permanent building has places for
  • 242 students beyond its permanent capacity

What this does and does not mean. Students at Lexington are not going without a classroom. The board’s plan says: “Temporary accommodation is provided at Lexington PS using a 12-room portapak. The gymnasium structure is not permanent.”[2] Published class sizes averaged 23.6 students in 2024-25.[7]

The problem is not packed rooms. It is that most of the school’s students depend on space that was never meant to be permanent.

How it compares

More than double the next school.

Of the 120 schools in our public board with a published capacity, no other is above 151%. On the most recent province-wide data, seven schools in Ontario ranked higher.

Waterloo Region District School Board, 2024-25

Students as a share of permanent capacity. Top ten of 120 schools.[1][2]

  1. Lexington PSWaterloo · 355 students, 113 places314%
  2. Lackner Woods PSKitchener · 620 students, 412 places150%
  3. Westheights PSKitchener · 480 students, 320 places150%
  4. Chalmers Street PSCambridge · 385 students, 257 places150%
  5. Blair Road PSCambridge · 405 students, 271 places149%
  6. Groh PSKitchener · 885 students, 597 places148%
  7. Winston Churchill PSWaterloo · 320 students, 216 places148%
  8. Centennial PSWaterloo · 415 students, 294 places141%
  9. Pioneer Park PSKitchener · 410 students, 294 places140%
  10. Parkway PSCambridge · 350 students, 251 places139%

All of Ontario, 2020-21

Students as a share of permanent capacity. Top ten of 4,790 schools.[3]

  1. Dunning-Foubert ESOttawa · 502 students, 75 places669%
  2. Castlefrank ESOttawa · 325 students, 53 places613%
  3. Bridlewood Community ESOttawa · 422 students, 93 places454%
  4. Korah C&VS IntermediateSault Ste. Marie · 188 students, 46 places409%
  5. Katimavik PSOttawa · 337 students, 96 places351%
  6. J J O'Neill Catholic SchoolGreater Napanee · 276 students, 84 places329%
  7. EIC Monseigneur BruyèreLondon · 225 students, 69 places326%
  8. Lexington PSWaterloo · 354 students, 113 places313%
  9. Orleans Wood ESOttawa · 224 students, 72 places311%
  10. John Young ESOttawa · 720 students, 248 places290%

2020-21 is the last year in the province-wide file, which Western University published from the Ministry’s School Facility Inventory System. The rank divides average daily enrolment by permanent capacity and covers elementary and secondary schools together. The seven schools above Lexington have between 46 and 96 permanent places each. In the same data, Lexington was the highest of 170 schools across both Waterloo Region boards, public and Catholic.

Who decides

The board can plan an addition. Only Queen’s Park can fund it.

School boards in Ontario do not pay for new schools or major additions out of their own budgets. They apply to the Ministry of Education’s Capital Priorities Program. The province sets the requirements, judges the business cases and decides which projects get money.

That leaves the board with a narrower job that still matters: choose which projects to put forward, make the strongest case for them, and tell families plainly what happened.

For Lexington, the board asked in 2012 and the province did not fund it. In the four funding rounds from 2021-22 to 2024-25, the project was not put forward at all.

The history

Sixteen years since the board said yes.

Every entry below comes from a board report, a board letter or provincial data. A child who started junior kindergarten in September 2012, when the addition was meant to open, finished Grade 12 this past June.

Students and permanent places, by school year

  • Students (October 31 headcount)
  • Permanent places
  1. 3682011-12
  2. 244582012-13
  3. 952013-14
  4. 2321132014-15
  5. 2015-16
  6. 2016-17
  7. 2017-18
  8. 3452018-19
  9. 2019-20
  10. 2020-21
  11. 2021-22
  12. 2022-23
  13. 2023-24
  14. 3551132024-25

Enrolment fell in 2012-13, the year boundary changes approved in the 2010 review took effect.[4] Permanent capacity rose from 58 to 113 places by 2014-15, after three kindergarten rooms were built. It has not changed since, while enrolment has grown by about half, from 232 to 355. In 2011-12 the provincial file counted the portapak as capacity, so that year has no permanent-places figure.[1][3]

Show this chart as a table
School yearStudentsPermanent placesShare of capacity
2011-12368Not comparable—
2012-1324458421%
2013-1424695259%
2014-15232113205%
2015-16250113221%
2016-17272113241%
2017-18312113276%
2018-19345113305%
2019-20350113310%
2020-21350113310%
2021-22350113310%
2022-23355113314%
2023-24350113310%
2024-25355113314%
  1. 1955to 1984

    A small neighbourhood school

    Lexington opened in 1955. The board closed it on June 30, 1984, moved its students to Bridgeport Public School and mothballed the building “in case the site was needed in the future.”[4]

  2. 1993

    The board

    Reopened with temporary wings

    The school reopened with “two 6 classroom porta-pack wings and a demountable gymnasium structure” added to the original building. A later staff report says: “When the school re-opened, it was projected to be viable for 10 to 15 years.”[4]

  3. 2009

    The board

    A review begins

    The board started an accommodation review of east Kitchener-Waterloo schools, partly because of “the need to address the temporary nature of Lexington P.S.” An engineering assessment that April found the school “appears to be in reasonably good condition” and would stay that way for another five years with proper maintenance.[4]

  4. 2010June 21

    The board

    Trustees approve a 13-classroom addition

    The board approved in principle “a thirteen classroom addition and renovations at Lexington Public School at an estimated amount of $4.2M, to tentatively be completed for September 2012.” The plan included a permanent classroom wing and improvements to the gym. The approval was “subject to and contingent on obtaining Ministry of Education funding.”[4][5]

  5. 2012May

    The board

    The request goes to the province

    At the Ministry’s request, board staff submitted an updated list of priority capital projects. Lexington’s addition was on it.[5]

  6. 2013January 24

    Queen’s Park

    The province funds three other projects

    The board told families in a letter: “Unfortunately, the Lexington P.S. addition and 410 Falconridge Drive school projects did not receive funding.” It added that the projects “remain as top priorities for the Board overall, and will be submitted again.”[5]

    This is the only provincial decision about Lexington in the board records I could find. It was made under a previous provincial government.

  7. 2013September

    The board

    Three kindergarten rooms are built

    A separate three-classroom addition for full-day kindergarten went ahead. The board said it was “strategically located so that replacement of the porta-pack classroom wing and other renovations may still occur once funding is allocated.”[5]

  8. 2018January

    The board

    Off the priority list

    The board’s draft 2017-2027 accommodation plan records that the 13-classroom business case “was never approved by the Ministry and is no longer within the priority list.”[6]

  9. 2021June 21

    The board

    A new ten-year plan

    Trustees adopted the 2020-2030 plan. Its short-term recommendation: “Consider temporary accommodation renewal, facility expansion or facility rebuild at Lexington PS.” In the plan’s chart of building condition against how full each school is, Lexington appears only in a footnote: “Lexington PS excluded from chart.”[2]

  10. 2021to 2024

    Board staff

    Screened out, four rounds running

    In each of four provincial funding rounds, board staff listed a Lexington rebuild among the projects not sent to the province: “Does not meet criteria; ineligible project.” The rows are reproduced below.[9][10][11][12]

  11. 2025September 15

    The board

    Still “proposed”

    A board report still lists the “Proposed Lexington Public School facility rebuild” under short-term actions for 2020 to 2025. The same report says details of the next provincial funding round “have not yet been released.”[8]

The screening lists

Four rounds. One line. No reason given.

Before each funding round, board staff list the projects they considered and did not send to the province. These are board staff’s words, not a provincial decision. This is Lexington’s row each time.

2021-22

Committee of the Whole, May 10, 2021

E25Facility rebuild at Lexington PSDoes not meet criteria; ineligible project for 2021/22

The row as printed in Appendix B of the staff report.

Sent to the province instead
  • New North Cambridge elementary school
  • New Breslau-Hopewell Crossing elementary school
  • Parkway PS addition
  • Waterloo-Oxford DSS addition
Trustees’ role
Trustees voted to approve the submission.
Read the list (PDF page 31)

2022-23

Board meeting, February 28, 2022

E25Facility rebuild at Lexington PSDoes not meet criteria; ineligible project for 2022-23

The row as printed in Appendix B of the staff report.

Sent to the province instead
  • New North Cambridge elementary school
  • Parkway PS addition
  • Waterloo-Oxford DSS addition
  • Ayr PS addition
  • New southwest Kitchener secondary school
Trustees’ role
Presented “for the information of the Board”, three days after staff submitted on February 25.
What the province funded
The board later reported: “None of the submitted projects were approved for funding.”
Read the list (PDF page 21)

2023-24

Committee of the Whole, October 16, 2023

E25Facility rebuild at Lexington PSDoes not meet criteria; ineligible project for 2023-24

The row as printed in Appendix B of the staff report.

Sent to the province instead
  • New North Cambridge elementary school
  • Parkway PS addition with child care
Trustees’ role
Presented “for the information of the Board”.
Read the list (PDF page 18)

2024-25

Committee of the Whole, September 16, 2024

E25Facility rebuild at Lexington PSDoes not meet criteria; ineligible project for 2024-25

The row as printed in Appendix B of the staff report.

Sent to the province instead
  • Huron Heights SS addition
  • New North Cambridge elementary school
  • New Rosenberg II elementary school with child care
Trustees’ role
Presented “for the information of the Board”.
What the province funded
In September 2025 the board reported that “none were approved.” In June 2026 the province announced $31.3 million for Rosenberg II.[13]
Read the list (PDF page 52)

Other rows give a reason

On the same lists, staff explain why other projects were held back:

  • “Premature due to lack of site servicing and timing requirements”
  • “Premature due to timing; boundary review recommended before submission”
  • “Does not meet criteria due to available capacity in the review area”

Lexington’s row never names the requirement it failed. The same unexplained line appears beside rebuilds or additions at Clemens Mill PS, Sunnyside PS and Waterloo Collegiate Institute.[12]

Trustees voted once

The 2021 submission went to trustees for approval. In 2022, 2023 and 2024 the report was presented “for the information of the Board,” so no trustee vote decided which projects went to Queen’s Park or which were left off.[9][10][11][12]

The provincial rules

What Queen’s Park asks for.

What qualifies

Projects that relieve accommodation pressure, replace schools in poor condition, support past school consolidations, serve French-language rights holders, or add child care to a larger project. They are expected to be shovel-ready.

What does not

The board’s reports list exclusions that include “projects addressing the renewal needs of a facility,” land-only requests, child-care-only requests and pressure caused by specialized programs such as French Immersion.

The pressure test

Priority goes “to projects with utilization equal to or greater than 100% (including capacity available in nearby schools) in the 5th year after opening.”

Who decides

The board chooses its projects and submits a business case for each. The Ministry of Education judges them against its criteria and decides what is funded.

The nearby-schools question

The province’s test counts space in nearby schools, and Lexington’s neighbours have room. The board’s 2020-2030 plan recommended that staff consider a boundary study for the area “to balance enrolment and facility utilization.”[2]

Is that why the rebuild is screened out? Is it the rule against renewal projects? Something else? The screening list does not say, and families should not have to guess. That is why I would ask for a public report on what Lexington needs to qualify.

Lexington and its neighbouring schools, 2024-25
SchoolStudentsPermanent placesShare
Lexington PS355113314%
Lester B. Pearson PS59565491%
Bridgeport PS31050761%
Millen Woods PS27549655%
Sandowne PS24545853%

Eligibility rules are quoted from the board’s Capital Priorities reports for 2021-22 through 2024-25, which summarize the Ministry’s launch memos for each round.[9][12]

What I would do as trustee

Put the question on the public record.

I’m Brian Best, and I’m running for public school trustee in Waterloo and Wilmot. This school needs permanent classrooms, not another decade of paperwork.

01

Move for a public decision

I would move that trustees decide, in public, whether to submit Lexington in the next funding round, with a staff report explaining what the project needs to qualify.

02

Publish the paper trail

I would move to publish every capital request, every screening reason and every vote. Parents deserve to see what we are asking for and what is stopping it.

03

Say who decided

Make no mistake: Queen’s Park needs to step up here. When the board asks and the province says no, families should hear that plainly, from the board, with the reason attached.

A trustee cannot fund a school or promise how a vote will go. A trustee can move the motion, ask for the report and make the answer public.

School facts

Lexington at a glance.

Address
431 Forestlawn Road, Waterloo
Grades
Junior kindergarten to Grade 6, English program
Trustee area
Waterloo and Wilmot
Built
1955, with later construction in 1958, 1963 and 1993. Three kindergarten rooms added in 2013.
Closed and reopened
Closed June 30, 1984 and mothballed. Reopened in 1993.
Site
6.37 acres
Temporary space
A 12-room portapak. The board’s plan notes the gymnasium structure “is not permanent”.
Building condition
Facility Condition Index of 38% in a 2019 assessment. Lexington has been part of board-wide roof (2023-24) and heating and ventilation (2024-25) renewal projects.
Class sizes, 2024-25
15 classes averaging 23.6 students. The largest had 27. No primary class was over 23.
Where students go next
Margaret Avenue PS for Grades 7 and 8, then Bluevale Collegiate Institute
Board planning area
E25 Waterloo East (Eastbridge, Colonial Acres, Lexington)
Board’s enrolment forecast
378 students by 2030 in the 2020-2030 plan, which is 335% of permanent capacity

Sources and method

Check my work.

  1. Ontario Ministry of Education, enrolment by school, 2024-25

    October 31 headcount, rounded to the nearest five. Lexington PS is school number 588326.

  2. WRDSB 2020-2030 Long-Term Accommodation Plan

    Review Area E25 on PDF page 100: capacity, portapak, recommendations and forecast. Figure 13 footnote on page 31. Definition of on-the-ground capacity on page 106. Adopted June 21, 2021.

  3. School Utilization in Ontario, Western University

    Ministry School Facility Inventory System records, 2010-11 to 2020-21. Source of the provincial rank and of capacity by year.

  4. Staff report on the East Kitchener-Waterloo accommodation review, June 21, 2010

    School history, the 2009 condition assessment and the recommendation for a 13-classroom addition.

  5. WRDSB letter to the Lexington community, April 30, 2013

    Confirms the 2010 approval in principle, the May 2012 submission, the January 24, 2013 funding announcement and the kindergarten addition.

  6. Draft 2017-2027 Long-Term Accommodation Plan, Committee of the Whole, January 22, 2018

    Review Area E25 history: the business case “was never approved by the Ministry and is no longer within the priority list.”

  7. Community Planning and Facility Partnership Opportunities report, September 15, 2025

    Lists the “Proposed Lexington Public School facility rebuild” under 2020-2025 short-term actions (PDF page 9) and reports the outcome of the 2024 submissions (page 8).

  8. 2021 Capital Priorities Program Submission, May 10, 2021

    Screening list in Appendix B, PDF page 31. Eligibility rules in the body of the report.

  9. 2022-23 Capital Priorities Program Submission, February 28, 2022

    Screening list in Appendix B, PDF page 21. Outcome reported to Committee of the Whole on October 17, 2022.

  10. WRDSB news, June 17, 2026

    The province announces $31.3 million for the new Rosenberg II elementary school in Kitchener. The release does not say which funding round it came from.

How the numbers were worked out

  • 314% is 2024-25 enrolment divided by the capacity published in the board’s 2020-2030 plan. The board has not published a newer capacity figure. The school is at 314% of its permanent capacity, which is about 214% over it.
  • The Ontario rank uses 2020-21, the last year in the province-wide file. It is a calculation from Ministry data, not a ranking the Ministry publishes. Duplicate records were removed, leaving 4,790 schools with a rate for that year.
  • The board comparison covers 120 of 122 schools. Oak Creek PS and Willow River PS have no published capacity yet. Laurelwood PS’s capacity includes its recent addition.
  • Different sources count students differently. For 2020-21 the Ministry headcount is 350, average daily enrolment is 354 and the board’s own count is 356.

Found a mistake?

If something here is wrong or out of date, email brian@best4schoolboard.com and I will correct it.

Last updated October 10, 2026