Elizabeth Ziegler
JK–6117% fullBuilt 1931New homes not counted yet
Full profile

Elizabeth Ziegler Public School

Grades JK–690 Moore Ave S, Waterlooelz.wrdsb.ca ↗

117%Of permanent places in use510 students · 437 places · 2024-25

In 2024-25, Elizabeth Ziegler had 510 students for 437 permanent places. Its 1931 building closed in March 2025 and is being restored, with classes due back in September 2027.

Share Elizabeth Ziegler

Follow Elizabeth Ziegler

Back to the ward overview

Coming up

Restoration[5]

  1. September 2027Classes due back in the restored building

How full is it?

Share Elizabeth Ziegler

117%510 students[1] for 437 permanent places[2]

Ward median 97%

One of 14 ward schools over 100% in 2024-25. #12 of 29 by how full it is.

This is the October 2024 count, taken in the original building before it closed in March 2025.[6]

0100200300400500437 places today510 students2011-122024-25

Enrolment is the Ministry’s October 31 headcount; permanent places are the board’s on-the-ground capacity. Portables aren’t counted as permanent places.

Students and educators

Share Elizabeth Ziegler: students and educators

22.4students in the average class[3]

Ward median 23 (elementary schools)

All 21 classes, including split grades, counted by the Ministry in September 2024. Kindergarten classes: 24.5 on average. Grade 1 to 3 classes with no older students: 18.7 on average.

The building is closed for restoration, so we don't calculate students per teacher.[4]

A staff page is a directory of names, not full-time equivalents: part-time teachers count as one each, and staff based at other schools aren’t listed. Not every school lists its support staff. The board doesn’t publish staffing by school.

Last rebuild or addition

Share Elizabeth Ziegler: last rebuild or addition

1931original building[2]

Ward median: built 1974

Under restoration now; classes are due back in September 2027.

  • 1931Original building
  • 1954Primary classroom wing
  • 1986Gym
  • 2026Restoration of the original building begins
  • 1986Done
    A primary classroom wing was added in 1954 and a gym in 1986.[7][8]
  • 2027Under way
    Closed in March 2025 after a concern was found with the facade. The board is restoring the original building: work began in April 2026 (budget about $12M) and classes are due back in September 2027. For 2026-27 its attendance area is split between Empire and Prueter. In 2025-26 its students attended Sandowne PS, where 12 portables were added, under the plan the Board approved on April 7, 2025.[6][9][10][5][12][11]

New homes in its attendance area

—not counted yet

While the school is closed, its neighbourhood is split between Empire and Prueter on the 2026-27 boundary map[12], so it has no area of its own to count. We’ll count it when the school reopens.

Tell us what you see at Elizabeth Ziegler

Portables, class sizes, repairs, or something this page gets wrong. Reports go to Brian and are checked before anything is published, and anything added from them is marked unverified.

Sources

  1. Ontario Ministry of Education, enrolment by school, 2024-25

    October 31 headcount. The Ministry rounds to the nearest five from 2018-19 on; earlier years in the same series (back to 2011-12) are exact counts.

  2. WRDSB 2020-2030 Long-Term Accommodation Plan

    Review Area E24 (Waterloo Central North (Lakeshore-Lincoln)). PDF page 98: permanent capacity (on-the-ground), year built and Facility Condition Index; enrolment forecast on page 99. Adopted June 21, 2021.

  3. Ontario Ministry of Education, elementary class size, 2024-25

    One row per class, counted in September 2024. A grade group of 1 to 4 pupils is shown as “<5”, so some averages are a range.

  4. Elizabeth Ziegler Public School website, staff list

    Read November 2, 2026. A directory of names, not full-time equivalents; part-time teachers count as one each.

  5. Elizabeth Ziegler PS website: Update on repair and restoration (June 2, 2026)

    “The school remains closed and is on track to open in September 2027.”

  6. Elizabeth Ziegler PS website: School closed for March 4 and 5, 2025

    The building closed from March 4, 2025.

  7. Elizabeth Ziegler PS School Valuation Framework, East Kitchener-Waterloo accommodation review, January 2010

    “When was the school built? 1931, 1954, 1986”. PDF page 10.

  8. Elizabeth Ziegler Public School website, About page

    “In 1954 a primary classroom wing was added to the school and in 1986 a school gym was built.” Read November 2, 2026.

  9. Major Capital Projects quarterly update, Business Services Standing Committee, June 8, 2026

    Work began in early April; ready for classes in September 2027. PDF page 21.

  10. Major Capital Projects quarterly update, Appendix A, June 8, 2026

    Elizabeth Ziegler restoration: in construction, about $12M, classes begin September 2027. PDF page 22.

  11. Elizabeth Ziegler PS website: Transportation and out-of-boundary requests for Elizabeth Ziegler families, 2025-26 (April 10, 2025)

    Current Elizabeth Ziegler students attend Sandowne PS in 2025-26 under the plan the Board approved April 7, 2025.

  12. WRDSB school boundary and location maps, 2026-27

    The board's ArcGIS boundary layers, read September 30, 2026.

  13. WRDSB 2020-2030 Long-Term Accommodation Plan, Figure 12

    The plan's condition bands: over 65% poor, 40 to 64% fair, under 39% excellent. PDF page 30.

  14. WRDSB, Accessibility Status by School

    Board web page, read October 25, 2026.

  15. Ontario Ministry of the Environment, Conservation and Parks, drinking water quality and enforcement data

    Lead samples taken at the school under O. Reg. 243/07, 2016-17 to 2024-25.

  16. WRDSB ventilation report

    Per-school ventilation type and standalone HEPA units; the board's chart was last updated November 28, 2024.

  17. Elizabeth Ziegler Public School website, news posts since 2017-18

    Closures, evacuations and hold-and-secure notices the school chose to post, read to September 3, 2026; counted once per event.

  18. Ontario Ministry of Education, school information and student demographics, preliminary 2024-25

    Special education and first language not English: 2024-25, school data as of July 2026. Low-income households: from the 2021 Census. The Ministry randomly rounds these percentages.

  19. EQAO, school results, 2024-25

    Share of fully participating students at or above the provincial standard; for the literacy test, fully participating first-time-eligible students who passed. EQAO posted 2025-26 results in October 2026.

Inferred from public documents, not a current account. Spot something wrong? brian@best4schoolboard.com

Read this first

Everything on these pages is inferred from public documents: Ministry of Education data, school board reports and meeting packages, school websites, and City of Waterloo open data.

It is not a current or complete account of any school. Most figures are a year or more old, some are our own calculations from those documents, and things at the school may have changed since. Check with the school or the board before you rely on a number.

Enrolment and capacity
October 2024 headcount
Building condition
2017 to 2020 assessments
Class sizes
September 2025 count
Staff lists
School websites, read November 2, 2026
New homes
City permits issued to August 21, 2026