Ward schoolsGrandview

Your address isn’t stored or logged.

29 schools
Colour by
Areas
Go to
Over time2024-25
Loading the map…

How full (2024-25)

  • Under 85%
  • 85–99%
  • 100–119%
  • 120–149%
  • 150% and up
Grandview
JK–6128% fullBuilt 1949New homes not counted yet
Full profile

Grandview Public School (New Hamburg)

Grades JK–6341 Huron St, New Hamburggvn.wrdsb.ca ↗

128%Of permanent places in use230 students · 179 places · 2024-25

In 2024-25, Grandview had 230 students for 179 permanent places (128% full). The board first raised an addition for this area in 2021, and it hasn't been built.

Share Grandview

Follow Grandview

Back to the ward overview

Nothing is scheduled for Grandview that we know of.

Follow Grandview

to hear when it comes up.

How full is it?

Share Grandview

128%230 students[1] for 179 permanent places[2]

Ward median 97%

One of 14 ward schools over 100% in 2024-25. Tied for #4 of 29 by how full it is.

0100200179 places today230 students2011-122024-25

Enrolment is the Ministry’s October 31 headcount; permanent places are the board’s on-the-ground capacity. Portables aren’t counted as permanent places.

Students and educators

Share Grandview: students and educators

24.6students in the average class[3]

Ward median 23 (elementary schools)

All 9 classes, including split grades, counted by the Ministry in September 2025. Kindergarten classes: 27.0 on average. Grade 1 to 3 classes with no older students: 20.0 on average.

We don't calculate students per teacher here: the school's website names no more teachers than the school has classes, so the list is incomplete.[4] The list also names 1 educational assistant and 1 early childhood educator.

A staff page is a directory of names, not full-time equivalents: part-time teachers count as one each, and staff based at other schools aren’t listed. Not every school lists its support staff. The board doesn’t publish staffing by school.

Last rebuild or addition

Share Grandview: last rebuild or addition

1949original building[2]

Ward median: built 1974

Last addition on record: office and staffroom addition, 2000.

  • 1949Original building: gym and six classrooms (opened September 1950)
  • 1963Four-classroom addition
  • 2000Office and staffroom addition
  • 2000Done
    The school opened in September 1950 with a gym and six classrooms. A four-classroom addition followed in 1963, and an office and staffroom addition in 2000.[5]
  • 2021Raised, not built
    An addition at Forest Glen or Grandview was first identified in the 2020-2030 plan (2021) and was not sent to the Ministry in any round from 2019 to 2024-25. Every year from 2021-22 to 2024-25, staff screened it as “premature”, with a boundary study or review recommended first. The board still listed it as a potential partnership project in September 2026.[6][7][2][8][9][10]

New homes in its attendance area

—not counted yet

The Township of Wilmot doesn’t publish its building permits as open data, so we can’t count new homes inside each Wilmot school’s area the way we do for Waterloo. Township-wide, the Region of Waterloo counted 29 new homes permitted in Wilmot in 2025 and 36 in 2024[11].

Tell us what you see at Grandview

Portables, class sizes, repairs, or something this page gets wrong. Reports go to Brian and are checked before anything is published, and anything added from them is marked unverified.

Sources

  1. Ontario Ministry of Education, enrolment by school, 2024-25

    October 31 headcount. The Ministry rounds to the nearest five from 2018-19 on; earlier years in the same series (back to 2011-12) are exact counts.

  2. WRDSB 2020-2030 Long-Term Accommodation Plan

    Review Area E17 (Wilmot Township), listed as Grandview PS (NH). PDF page 80: permanent capacity (on-the-ground), year built and Facility Condition Index; enrolment forecast on page 81. Adopted June 21, 2021.

  3. Ontario Ministry of Education, elementary class size, 2025-26

    One row per class, counted in September 2025. A grade group of 1 to 4 pupils is shown as “<5”, so some averages are a range.

  4. Grandview Public School (New Hamburg) website, staff list

    Read November 2, 2026. A directory of names, not full-time equivalents; part-time teachers count as one each.

  5. Grandview Public School (New Hamburg) website, About page

    “Initially Grandview consisted of the gymnasium and six classrooms.” “A four-classroom addition was built in 1963.” “In 2000 an office and staffroom addition were built.” Read November 2, 2026.

  6. 2021-22 Capital Priorities screening, Committee of the Whole, May 10, 2021

    Screening row for the New Hamburg addition. PDF page 31.

  7. 2022-23 Capital Priorities submission and screening, Board meeting, February 28, 2022

    Screening rows for the E17 and E23 additions. PDF page 21.

  8. 2023-24 Capital Priorities screening, Committee of the Whole, October 16, 2023

    Screening row for the New Hamburg addition. PDF page 18.

  9. 2024-25 Capital Priorities screening, Committee of the Whole, September 16, 2024

    Screening row for the New Hamburg addition (“boundary review”). PDF page 51.

  10. Potential partnership opportunities, Board meeting, September 28, 2026

    New Hamburg addition still listed. PDF page 76.

  11. Region of Waterloo, 2025 building permit activity and growth monitoring (PDL-GDS-26-015, Appendix A)

    Township-wide new homes permitted in Wilmot: 29 in 2025 and 36 in 2024 (PDF page 20). Wilmot publishes no per-address permit data.

  12. WRDSB 2020-2030 Long-Term Accommodation Plan, Figure 12

    The plan's condition bands: over 65% poor, 40 to 64% fair, under 39% excellent. PDF page 30.

  13. WRDSB, Accessibility Status by School

    Board web page, read October 25, 2026.

  14. Ontario Ministry of the Environment, Conservation and Parks, drinking water quality and enforcement data

    Lead samples taken at the school under O. Reg. 243/07, 2016-17 to 2024-25.

  15. WRDSB ventilation report

    Per-school ventilation type and standalone HEPA units; the board's chart was last updated November 28, 2024.

  16. Grandview Public School (New Hamburg) website, news posts since 2017-18

    Closures, evacuations and hold-and-secure notices the school chose to post, read to September 3, 2026; counted once per event.

  17. Ontario Ministry of Education, school information and student demographics, preliminary 2024-25

    Special education and first language not English: 2024-25, school data as of July 2026. Low-income households: from the 2021 Census. The Ministry randomly rounds these percentages.

  18. EQAO, school results, 2024-25

    Share of fully participating students at or above the provincial standard; for the literacy test, fully participating first-time-eligible students who passed. EQAO posted 2025-26 results in October 2026.

Inferred from public documents, not a current account. Spot something wrong? brian@best4schoolboard.com

Read this first

Everything on these pages is inferred from public documents: Ministry of Education data, school board reports and meeting packages, school websites, and City of Waterloo open data.

It is not a current or complete account of any school. Most figures are a year or more old, some are our own calculations from those documents, and things at the school may have changed since. Check with the school or the board before you rely on a number.

Enrolment and capacity
October 2024 headcount
Building condition
2017 to 2020 assessments
Class sizes
September 2025 count
Staff lists
School websites, read November 2, 2026
New homes
City permits issued to August 21, 2026

Found something wrong or out of date? Email brian@best4schoolboard.com and it gets fixed.