Ward schoolsNew Dundee

Your address isn’t stored or logged.

29 schools
Colour by
Areas
Go to
Over time2024-25
Loading the map…

How full (2024-25)

  • Under 85%
  • 85–99%
  • 100–119%
  • 120–149%
  • 150% and up
New Dundee
JK–672% fullBuilt 1928New homes not counted yet
Full profile

New Dundee Public School

Grades JK–61430 Bridge St, New Dundeendd.wrdsb.ca ↗

72%Of permanent places in use165 students · 228 places · 2024-25

In 2024-25, New Dundee had 165 students and 228 permanent places (72% full). Last addition on record: two kindergarten classrooms, 2013.

Share New Dundee

Follow New Dundee

Back to the ward overview

Nothing is scheduled for New Dundee that we know of.

Follow New Dundee

to hear when it comes up.

How full is it?

Share New Dundee

72%165 students[1] for 228 permanent places[2]

Ward median 97%

0100200228 places today165 students2011-122024-25

Enrolment is the Ministry’s October 31 headcount; permanent places are the board’s on-the-ground capacity. Portables aren’t counted as permanent places.

Students and educators

Share New Dundee: students and educators

21.4students in the average class[3]

Ward median 23 (elementary schools)

All 8 classes, including split grades, counted by the Ministry in September 2025. Kindergarten classes: 18.5 on average. Grade 1 to 3 classes with no older students: 20.0 on average.

About 15 students for each teacher named on the school’s website: 165 students (October 2024)[1] ÷ 11 teachers listed on November 2, 2026, counting any special-education and ESL teachers listed[4].derived The list also names 1 educational assistant and 2 early childhood educators.

A staff page is a directory of names, not full-time equivalents: part-time teachers count as one each, and staff based at other schools aren’t listed. Not every school lists its support staff. The board doesn’t publish staffing by school.

Last rebuild or addition

Share New Dundee: last rebuild or addition

1928original building[2]

Ward median: built 1974

Last addition on record: two kindergarten classrooms, 2013.

  • 1928Original building
  • 2008Office, staffroom and workroom addition
  • 2013Two kindergarten classrooms
  • 2013Done
    The school says “Several additions including a gymnasium have been added on over the years”, followed by an office, staffroom and workroom addition in 2008 and “two new kindergarten classrooms” for full-day kindergarten in 2013. It does not date the earlier additions.[5]

New homes in its attendance area

—not counted yet

The Township of Wilmot doesn’t publish its building permits as open data, so we can’t count new homes inside each Wilmot school’s area the way we do for Waterloo. Township-wide, the Region of Waterloo counted 29 new homes permitted in Wilmot in 2025 and 36 in 2024[6].

Tell us what you see at New Dundee

Portables, class sizes, repairs, or something this page gets wrong. Reports go to Brian and are checked before anything is published, and anything added from them is marked unverified.

Sources

  1. Ontario Ministry of Education, enrolment by school, 2024-25

    October 31 headcount. The Ministry rounds to the nearest five from 2018-19 on; earlier years in the same series (back to 2011-12) are exact counts.

  2. WRDSB 2020-2030 Long-Term Accommodation Plan

    Review Area E17 (Wilmot Township). PDF page 80: permanent capacity (on-the-ground), year built and Facility Condition Index; enrolment forecast on page 81. Adopted June 21, 2021.

  3. Ontario Ministry of Education, elementary class size, 2025-26

    One row per class, counted in September 2025. A grade group of 1 to 4 pupils is shown as “<5”, so some averages are a range.

  4. New Dundee Public School website, staff list

    Read November 2, 2026. A directory of names, not full-time equivalents; part-time teachers count as one each.

  5. New Dundee Public School website, About page

    “In 2008, a beautiful office, staffroom, and workroom addition were also added. In 2013 we welcomed the addition of two new kindergarten classrooms with Full Day Kindergarten.” Read November 2, 2026.

  6. Region of Waterloo, 2025 building permit activity and growth monitoring (PDL-GDS-26-015, Appendix A)

    Township-wide new homes permitted in Wilmot: 29 in 2025 and 36 in 2024 (PDF page 20). Wilmot publishes no per-address permit data.

  7. WRDSB 2020-2030 Long-Term Accommodation Plan, Figure 12

    The plan's condition bands: over 65% poor, 40 to 64% fair, under 39% excellent. PDF page 30.

  8. WRDSB, Accessibility Status by School

    Board web page, read October 25, 2026.

  9. Ontario Ministry of the Environment, Conservation and Parks, drinking water quality and enforcement data

    Lead samples taken at the school under O. Reg. 243/07, 2016-17 to 2024-25.

  10. WRDSB ventilation report

    Per-school ventilation type and standalone HEPA units; the board's chart was last updated November 28, 2024.

  11. New Dundee Public School website, news posts since 2017-18

    Closures, evacuations and hold-and-secure notices the school chose to post, read to September 3, 2026; counted once per event.

  12. Ontario Ministry of Education, school information and student demographics, preliminary 2024-25

    Special education and first language not English: 2024-25, school data as of July 2026. Low-income households: from the 2021 Census. The Ministry randomly rounds these percentages.

  13. EQAO, school results, 2024-25

    Share of fully participating students at or above the provincial standard; for the literacy test, fully participating first-time-eligible students who passed. EQAO posted 2025-26 results in October 2026.

Inferred from public documents, not a current account. Spot something wrong? brian@best4schoolboard.com

Read this first

Everything on these pages is inferred from public documents: Ministry of Education data, school board reports and meeting packages, school websites, and City of Waterloo open data.

It is not a current or complete account of any school. Most figures are a year or more old, some are our own calculations from those documents, and things at the school may have changed since. Check with the school or the board before you rely on a number.

Enrolment and capacity
October 2024 headcount
Building condition
2017 to 2020 assessments
Class sizes
September 2025 count
Staff lists
School websites, read November 2, 2026
New homes
City permits issued to August 21, 2026

Found something wrong or out of date? Email brian@best4schoolboard.com and it gets fixed.